The Superstructure Package

Form it. Reo it. Place it.

FormFlo · ReoFlo · CreteFlo · VertiFlo

Four Flo take-off engines for the structure trade, built under the Gridstone mark and working off one read of your drawings. Formwork, reinforcement, concrete and structural walls — measured from the engineer’s documentation, issued as packages your fabricator and your fixers can actually build from.

A Gridstone package All classes — Class 1 to 10 and civil Australia-wide Every line carries its basis

The Package

One read of the drawings. Four trades measured.

Superstructure is a sequence before it is a set of trades. Every concrete element on your job gets formed, reinforced and placed — in that order, every time. The package is built the same way.

01 — FORM

FormFlo

Contact area, system and sets. The formwork sets the shape and the cycle.

02 — REO

ReoFlo

Every bar marked, shaped, scheduled and placed on a marking plan.

03 — PLACE

CreteFlo

Net volume, grade off the schedule, pour by pour.

04 — VERTICALS

VertiFlo

Walls, cores and blades — four families, run through the same chain.

Why four engines, not four spreadsheets

Because the trades are not independent. The places they meet are exactly where a take-off quietly goes wrong, so we wire those hand-offs rather than leave them to four separate measurers.

Form → Reo

Cover is measured from the form face. The formwork sets the datum that the entire cover layer depends on — so a form position settled in one engine and never fed to the other is a silent error in the steel.

Reo → Place

Cover has to survive the pour. Chairs and spacers, congestion, vibrator access: reinforcement that is correct on paper and unplaceable in the pour is not correct.

Place → Form

Wet concrete pressure is an output of the concrete and an input to the formwork. Pour rate and lift height change what the form has to hold.

Place → Form

Stripping strength closes the loop. When the concrete is strong enough to strip is what decides how many sets of formwork you need standing at once.

The Engines

Each one sold on its own. Sharper together.

Every engine ships, trials and prices as a standalone take-off. Run the package and the drawings are read once and feed all four — which is the whole point.

FormFloIn trial

Formwork take-off

Contact area, system selection and the set count that actually governs your hire bill — plus props, back-props and the strip sequence.

  • Deck and table systems, permanent decking, conventional formwork
  • Formwork contact area by face, with finish class carried per face
  • Sets required, crane lifts, strip and back-prop sequence
FormFlo in detail →
ReoFloIn trial

Reinforcement take-off

Every bar marked, scheduled, shaped and placed on a marking plan — issued in your fabricator’s own call-off format.

  • Bar mark schedule with drawn shapes and leg dimensions
  • Marking plan — every mark stamped at its location
  • Accessories quantified, not just listed: chairs, spacers, pods, tie wire
ReoFlo in detail →
CreteFloIn trial

Concrete take-off

Net volume with the voids actually deducted, the right grade off the schedule, and the pour sequence to go with it.

  • Net m³ — pods and voids out, set-downs and thickenings in
  • Mix, grade and exposure read off the schedule, never assumed
  • Pour schedule and pour plan, plus the ancillaries everyone forgets
CreteFlo in detail →
VertiFloIn trial

Structural walls take-off

Four wall families in one engine — permanent-form, masonry, precast and in-situ — plus shear, core and blade walls.

  • Permanent-form, core-filled masonry, precast / tilt-up, in-situ RC
  • Shear, core and blade walls handled as structure, not as a leftover
  • Reo and core fill handed to ReoFlo and CreteFlo with the correct element identity
VertiFlo in detail →

What You Get

A buildable package, not a quantity summary.

A summary is a number for an estimator. It does not tell a fabricator what to bend or a fixer which bar goes where. Every Gridstone package is issued as documents the site can work off.

1

Bar mark schedule, with shapes

Mark, product code, shape code, number off, cut length, the shape drawn with dimensions over, and mass. Grouped by element, one page per lot or unit.

2

Marking plan

Every mark stamped at its location on the plan, keyed to the schedule. The marks on the plan and the marks on the schedule always agree.

3

Bar bending schedule

Shape codes with A, B, C and D leg dimensions — the cut-and-bend shop sheet, issued in your fabricator’s own call-off format where you have one.

4

Concrete workbook

Summary, mix schedule, pour schedule, pour plan, concrete BOQ, finishing and curing, test plan and embodied carbon.

5

Formwork take-off

Contact area by face with finish class, system comparison, sets required, crane lifts and the strip and back-prop sequence.

6

Accessories, quantified

Chairs, spacers, pods, tie wire, membrane, sand blinding, props, ties — each as a line with a quantity and a supply-by, never as prose.

How It Works

Read the drawings. Prove the read. Then measure.

Most take-off errors are not arithmetic. They happen upstream, when something on the drawings was never read, or was read and quietly assumed.

You send the set

The structural set at its current revision. PDF is fine. We confirm the scope we can measure and the price before anything starts.

The read is gated

Every sheet is registered and every sheet is read. The take-off does not start until that register is complete — a drawing nobody opened is the most expensive sheet on the job.

The engines measure

The same read feeds formwork, reinforcement, concrete and walls. One element catalogue, one set of constants, one house style across all four.

Gaps become questions

Where the drawings are silent or contradict each other, you get a written query naming the sheet and the exact missing datum. We do not invent a value to make a total look finished.

Nothing is held hostage

The job is released while a query is open. Only the marks that genuinely depend on the answer are held — so your fabricator can start on the rest.

Issued against a revision

The package names the drawings and revisions it was measured from, so when a revision lands you know precisely what has to be re-checked.

Where We Stand

We measure. Your engineer designs.

These are take-off and quantity engines. They read the engineer’s output; they never re-derive it. We do not size members, we do not check capacity, and we do not certify. Where something we measure looks inconsistent with the documentation, you get a flag and a question — never a silent correction and never an assertion dressed up as authority.

Every line carries its basis. Measured lines name the drawing they came off. Provisional lines say so and name the datum that is missing.

Drawings win. The job’s documentation is the first authority, then the Standard, then a question to you. In that order, every time.

Nothing is left behind. The schedule tables are exhausted before any allowance is raised — an allowance is a last resort, not a shortcut.

One owner per number. Steel, concrete, formwork and walls each own their own quantities, so nothing is counted twice across the package.

Pricing

Priced on what we measure.

No seats, no annual licence, no minimum. You pay for the take-off you asked for, on the unit the trade is actually bought in.

EnginePriced onTypical use
ReoFloPer tonne of steel scheduled Fabricators, reinforcement contractors, builders scheduling their own steel
CreteFloPer square metre of slab area Concreters and builders pricing supply, placement and ancillaries
FormFloPer square metre of formwork contact area Formwork subcontractors pricing area and set counts
VertiFloPer square metre of wall face Wall and core packages on Class 2 and above
The Superstructure PackageBundled across all four One read of the drawings feeding the whole structure trade

Rates are quoted per job before we start, off the drawings you send. Ask us for a number on a live set and you will have one.

Who We Are

Built by people who have stood on the slab.

Thirty years on the tools and the drawings

The rules inside these engines are not generic estimating logic. They are the calls a detailer makes reading a real set: which plan governs, what a dashed line means, when a set-down cranks and when it does not, which revision letter wins.

Founded by Nathan Porter and Peta-Lee Jeffries

Gridstone is built for Class 2 and multi-storey construction, and it is the trade mark every Flo engine is built under. The Superstructure Package is the first to market. More about Gridstone →

Australia-wide, every class

Class 1 through 10 and civil. Where a rule is state-specific, the engine resolves it from the site address rather than applying one state’s law everywhere.

Send us the drawings.

Structural set, current revision, PDF is fine. We will come back with the scope we can measure, anything we need answered, and a price before we start.

hello@gridstone.au